September 27, 2016 — 2016 LIF survey summary PDF
July 15, 2016 — One more PPMS is installed in bldg. #3 at Shanghai Lab and will be commisioning soon.
February 16, 2016 — Magnetron Sputtering System located at bldg. #6 of Shanghai branch is commissioning now. Mo, Al, Al2O3, ITO, and AZO targets are available.
December 13, 2015 — Impedance, raman, and Infrared are commissioning at Beijing lab. All are welcomed to use.
December 11, 2015 — 2015 Summary of LIF
September 10, 2015 — Gas_loading system at Shanghai is fully functioning now. The sysetm is capable of loading many types of DACs. Available gas: Helium, Neon, Argon, Nitrogen, and Hydrogen. Please contact Haiyun at hy.shu@hpstar.ac.cn for details.
| Thursday| January 14, 2016 | ||
| Session1 Presentation | ||
| 9:00-9:30 | Zhongli Fan | Room 201 | 
| 9:30-10:00 | Yuan Xu | Room 201 | 
| 10:00-10:05 | Break | |
| 10:05-10:35 | NaNa Li | Room 201 | 
| 10:35-10:45 | Discussions (ERT members) | Room 201 | 
| Sessuion 2 Individual discussion | ||
| Group 1: Junyue Wang, Wenge Yang, Zhiqiang Chen (Room 201) 
 Group 2: Tsu-Chien Wen, Yang Ding, Lin Wang (Room 409) | ||
| 10:45-11:00 | Group 1 discuss with Potential 1; Group 2 discuss with Potential 2. | |
| 11:00-11:15 | Group 1 discuss with Potential 2; Group 2 discuss with Potential 1. | |
| 11:15-11:30 | Final-decision discussions (ERT members) | Room 201 | 
(updated through Dec.12.2015)
| Capabilities/research filed | Current status | |
| Gas Loading | Loading many types of DACs. Helium, Neon, Argon, and Nitrogenare available | Fully operational @ Shanghai | 
| Glovebox | Help with sensitive sample loading | Fully operational @ Shanghai | 
| Raman | Raman/UV/PL | Fully operational @ Shanghai, Changchun, commissioning @ Beijing | 
| FIB | Micro Machining SEM/EBSD CVD deposition | Fully operational @ Shanghai | 
| PPMS | Electrical Transport Thermal Transport Thermal expansion Heat Capacity. etc | @ Shanghai Many functions operational, some commissioning | 
| MPMS | Magnetization Electrical resistance | @ Shanghai Many functions operational, some are commissioning | 
| High-performance Computing Cluster (HPC) | Computation | Fully operational @ Shanghai | 
| Small processing center | Mechanical processing | Fully operational @ Shanghai | 
| CNC lathe | Mechanical processing | Fully operational @ Shanghai | 
| Impedance | Electrical conductivity of materials under high pressure/shear | Fully operational @ Changchun, commissioning @ Beijing | 
| Infrared | Chemical reaction and phase transition | commissioning @ Beijing | 
| Micromanipulator | Micrometer size sample preparation small sample loading in DAC | Fully operational @ Changchun | 
| Laser-Heating | Double sided laser heating | Commissioning | 
| XRD | Structure/Phase characterization | Unfinished @ Shanghai and Beijing | 
| Ultrafast | Dynamics of charge (electron or hole) transport across and/or chemical transformation at the interface of functional materials at or far from equilibrium conditions | Unfinished @ Shanghai | 
| MultiAnvil | Sample synthesis or property measurement at HP and HT | Unfinished @ Shanghai | 
| Differential Scanning Calorimetry (DSC) | Thermal transitions in polymers Characteristic-temperature measurement Oxidative stability test, etc | Unfinished @ Shanghai | 
| Magneto Sputtering System | Coating for high pressure electrical transport measurement and structure measurements Fabricating thin film and novel 2D materials | Unfinished @ Shanghai |